Brick walls of a house going up on their concrete base course, MCI Construction project site in Saint-André-de-Roquelongue

What holds up the whole house

From the earthworks to the watertight shell, this is the part of the job you never see again once the house is finished — and yet it is what decides how solid it is.

Foundation reinforcement in its formwork at the bottom of a trench, before the concrete pour

A build controlled from start to finish

Many firms coordinate subcontractors. At MCI Construction, structural work is the trade we started in: the teams who dig, fix the reinforcement and build the walls are our own — from the first bucket of the digger to the watertight stage.

That direct control changes everything: one person in charge, one single standard, and technical decisions taken on the project site by the people who actually do the building.

It applies to a new house just as much as to a home extension, a slab or a suspended floor over a crawl space: the same teams, the same proper trade standards.

How it works

Each stage determines the next — and the final strength of the building.

  1. Earthworks

    Preparing the ground, excavating and levelling, taking account of the nature of the soil — in the Aude, the shrinking and swelling of clay soils calls for real rigour.

  2. Foundations

    Reinforced foundations sized from the soil survey: they carry the strength of the whole building, for decades.

  3. Walls & floors

    The walls go up along with the ring beams, then the floors: ground-bearing slab or insulated floor over a crawl space. Plumb and levels are checked continuously.

  4. Roof structure & roof covering

    Making the house watertight: a traditional roof structure or trussed rafters, then a tiled roof covering, anchored down to stand up to the Tramontane. Until the house is watertight, no other trade can follow on behind us.

Our projects

Once the house is finished, none of this can be seen any more. Yet this is where the work is judged: the depth of the trenches, the density of the reinforcement, the accuracy of the levels.

Strip foundation trenches opened up on reduced-level ground, before the reinforcement goes in
Strip foundation trenches
Reinforcement for a foundation footing awaiting the concrete pour, at the bottom of a trench
Reinforced footings
Concrete being pumped into a reinforced foundation trench, in Coursan
Pumped concrete pour — Coursan
Floor over a crawl space with insulating infill blocks, welded mesh reinforcement and openings left for the services, in Saint-André-de-Roquelongue
Insulated floor — Saint-André-de-Roquelongue
Timber roof structure set on the walls of a house, before the roof covering is laid
Roof structure in place
House in concrete blocks with lintels and its barrel-tile roof covering already laid
Walls up, house watertight

Two of these project sites are documented in full, step by step. At Coursan, the foundations and slab of a barn extension : excavations down to 2 m, steel reinforcement, pump-pouring and a 15 cm waterproofed concrete slab. At Saint-André-de-Roquelongue, an insulated floor over a crawl space of 12 × 10 m, with floor beams laid without props and the services prepared beneath the crawl space before the pour.

Your protection

Structural work is covered by the ten-year guarantee (garantie décennale): damage compromising the soundness of the structure is insured for ten years. The guarantee of perfect completion, the two-year guarantee and the dommages-ouvrage insurance complete this cover on full construction projects.

1 year

Garantie de parfait achèvement

For the year following handover, any defects reported are put right by the company — the French one-year defects warranty.

2 years

Garantie biennale

This two-year warranty covers equipment that can be removed from the structure: taps, shutters, boiler…

10 years

Garantie décennale

For ten years it covers damage that affects the strength of the building.

In place

Assurance dommages-ouvrage

This insurance pre-finances repairs without waiting for a court decision. You are given the certificates.

FAQ

Why does structural work matter so much?

Structural work literally carries everything else: a weakness in the foundations or in the walls shows up years later as cracks, water ingress or structural damage. It is the part of the job where cutting corners costs the most.

Do you carry out structural work on its own?

Yes, that is possible: we can take on the structural work alone — foundations, walls, floors, making the building weathertight — as well as a complete build. Every project starts with a visit and a free quote.

Who provides the soil survey, and what difference does it make to the quote?

A large part of the Aude lies in a clay shrink-swell zone: in that case it is the seller of the building plot who must supply the geotechnical survey, valid for thirty years — ask for it before you buy and keep it. It is what sets the depth and the type of foundations, and therefore the most variable item in any structural work estimate. Send it to us as soon as we visit: we size the works accordingly, and the quote is then based on your actual ground rather than on an average.

Foundations, walls, a floor or a complete house: let's discuss it on site — the study and the quote are free.